Introduction
The Supreme Court’s decision in Earthco Soil Mixtures Inc. v Pine Valley Enterprises Inc. can be summarized in the words of its trial judge: an “expensive but calculated mistake”.1 This statement, so succinct that it travelled all the way into Justice Martin’s closing remarks, highlights the primacy of the intentions of the parties even when their actions become disadvantageous.
Moving further from a strict textual methodology to an expansive contextual approach, the Supreme Court provides more latitude to parties to demonstrate their expectations through their behaviour, and more discretion for judges to rule in the interest of public policy. Earthco’s holistic review of an agreement between parties does not require that all pre- and post- contractual behaviour be reviewed when interpreting a clause, but instead indicates that all evidence material to the dispute is worthy of consideration.
In this paper, I will examine how evidence of the intentions of the parties, supporting a public policy-driven interpretation of commercial contracts, can be gathered from within the text and surrounding the text. Earthco’s example, arising from the precedents set in Sattva Capital Corp. v Creston Moly Corp.2 and Tercon Contractors Ltd. v British Columbia (Transportation and Highways),3 expands the landscape of what is available for an interpretation aligned with the parties’ expectations within reasonable limits. In this way, I will identify how Earthco meaningfully expands equitable discretion through a focus on the key features and considerations of the parties.
Part One: The Will Within the Text
A. Modern textual interpretation and the role of statutory limitations
In Levison v Patent Steam Carpet Cleaning Co. Ltd.,4 Lord Denning identifies that within the bounds of strict construction, justice cannot be realized within the contract; it was too specific to imply a term that would amend the breach. So instead, Lord Denning redirects his gaze to the root of the contract, which is its purpose in context, to identify a fundamental breach.5
In Tercon, the Supreme Court replaced the doctrine of fundamental breach with a tripartite test, giving the courts more latitude to reject unreasonable terms.6 While the exclusion clause in this case was not so specific that it prevented implying a term, the court rejects the clause altogether for its lack of consistency with the holistic contract.7 The commercial implications of the case, indicated through the factual matrix,8 required a narrow reading that better recognized the relationship between the parties.
Steven Waddams suggests that the court likely anticipated that any gaps in the Tercon test would be supplemented by consumer protection legislation, as is the case in England and Europe.9 Had this occurred, the court’s narrow construction of the text in the interest of the consumer may have encouraged a stronger trend. However, in the absence of this, Sattva championed a contextual approach. Likely alive to the gaps left by the court’s dismissal of the doctrine of fundamental breach,10 Sattva stands for the principle that when the ordinary meaning of a clause is not descriptive enough, evidence from the time of the execution of the contract is a welcome supplement.11 This approach, while expansive on its face, limits the temporal breadth of evidence that may be used to inform the contract, and maintains an emphasis on an analysis of the text where the language is sufficiently specific.
The chronology from cases like Levison to Sattva highlights how the interpretation of problematic clauses in the interests of justice continues to seek a Goldilocks-level of specificity: not too specific to exclude an equitable outcome, and not too vague to render the contract or clause unenforceable. It is for this reason that Earthco interprets terms such as “quality” according to what the parties understood in their commercial context.12 The Supreme Court distinguished when terms can be reasonably interpreted according to their legal meaning, and when an alternative or colloquial meaning may be more appropriate: it is not dependent on the specificity of the parties, but rather on their knowledge, and the purpose of their agreement and how it was modified. In doing so, Earthco responds to the ongoing dialogue on the importance of specificity, offering an alternative approach grounded in context. Justice Martin clarifies that “the meaning of even legal terms may depend on who the contracting parties are, their relationship to each other and whether they are sophisticated at contracting.”13 This emphasis indicates that a textual analysis may consider the surrounding context where there is ambiguity in the text, as well as where the text may appear sufficiently specific; the specificity of the terms alone may not always be determinative.
i. Statutory interpretation in Tercon and Earthco
The high degree of specificity that would have been required to oust the statutory requirements in Tercon also bears on the role and function of the statute informing the contract. Particularly because the legislator was a party to the agreement in Tercon, the court’s interpretation of statutory limitations focused on the core purpose and intention of the statute, which was to promote transparency and fairness.14 In light of these goals, the court reasons that it would be unlikely that a party, no matter their sophistication, would enter an agreement that ousts the government’s statutory obligations.15
The exclusion clause, if upheld, would have nullified the core obligations of the government to pursue fairness in the tendering process. This furthers the aim of the third prong of the Tercon test, which asks if the recognition of the clause would be contrary to public policy.16 While the Province argued that Tercon was a sophisticated party, capable of accepting the consequences of an agreement that excludes an obligation to act fairly, the language of the agreement did not amount to a waiver of liability from any breach, including a fundamental breach.17 This was the language used in Hunter Engineering Co. v Syncrude Canada Ltd., which indicated that the parties anticipated and yet still waived breaches of a fundamental nature.18 Instead, there was no indication in Tercon that the parties intended to waive such core obligations as fairness and transparency; the language in the exclusion clause was not proportionate to the degree of risk associated with waiving a key statutory obligation.
The manner in which Earthco draws from Tercon highlights that Tercon’s interpretive approach focuses on specificity, but in practice is also a balancing act. In Earthco, the contract’s potential modifications to the parties’ obligations under the Sale of Goods Act19 “do not form a substantial part of the entire structure and basis of the SGA,”20 and therefore are of lesser significance to the parties’ relationship to the statute as a whole. As a baseline, the significance of the modified terms are not so strong as to oust all statutory obligations, but are instead specific to the scope and nature of the agreement.
This interpretation reconciles the implicit proportionality of Tercon with the flexibility of the contextual approach in Sattva. Justice Martin highlights that there is a “range of circumstances and sophistication in contracting”21 which includes the degree to which they displace or selectively uphold statutory requirements. This rationale is used by the majority in Earthco to draw a distinction between the centrality of the statutory provisions in Tercon and the lesser importance of the statute in Earthco: while in Tercon, the clause in question had the potential to contradict the core purpose of the statute, in Earthco, the contract modifies a provision that was not central to the SGA. Rather, the parties only sought to modify the SGA in the interest of expediency, and so it is not as necessary to weigh the importance of the parties’ statutory obligations against their commercial interests. While in Tercon, a high degree of specificity in the clauses was required to redefine the parties’ obligations of transparency and fairness, it is entirely possible for the parties in Earthco to achieve transparency and fairness while ousting their statutory obligations.
B. Textual interpretation as a device for commercial certainty
Earthco’s decreased emphasis on the specificity of a clause offers more latitude for decisions made in the interest of public policy, where judges can balance “protections for parties, freedom of contract and commercial certainty”.22 While these objectives may appear disparate, and there may even be a question of whether commercial certainty is a public policy interest at all, Waddams reminds his reader that public policy should not conform to an isolated category, or be outrightly opposed to one outcome, but instead “be recognized as a large and open-ended exception to the principle that contracts are always enforceable”.23
Earthco is an example of where public policy interests are in tension with commercial standards, particularly those set out in the SGA, but commercial certainty is achieved by reconciling commercial expectations and the intentions of the parties represented in the text of the contract. One way this was accomplished was by looking to the allocation and acceptance of risk necessary to support an exclusion clause. The choice to contract against the SGA is itself an acceptance of risk which implies the parties knew they would not be protected uniformly by the Act.24 That the SGA permits this was a legislative choice made in the interest of freedom of contract, which the court in Earthco aims to uphold by allowing “space for what the parties objectively intended those words to mean.”25
In this manner, while the focus of the Supreme Court’s decision in Earthco is on how the factual matrix informs contractual interpretation, this finding is supported by the acceptance of risk present in the parties’ choice to contract out of statutory obligations. This is similar to Persimmon Homes Ltd. v Ove Arup & Partners Ltd. & Anor,26 where exemption clauses were upheld because the acceptance of risk associated with the clauses was reflected in the text of the contract. The element of obtaining indemnity insurance was not only a component of the contract, but referenced in the exemption clauses themselves.27 This demonstrated that the risks associated with the clauses were contemplated by the parties in line with industry standards; the England and Wales Court of Appeal took notice of the fact that contractors who accept larger risks in a commercial context will accordingly be insured for those risks, and in this case, they had taken steps to be insured adequately.28
While in Persimmon, there was no statutory authority to comply with or modify within the contract, the act of obtaining insurance proportionate to the allocation of risk is similar in its effect, redefining the obligations of the parties: both actions were considered in the regular course of doing business, with the intentions of the parties reflected in the level of insurance purchased, or the degree to which they parties chose to rely on the SGA. The range of choices in each case indicate that the outcomes were intentional, where the parties considered the consequences of paying more or less for insurance, and relying on more or less of the SGA. In both cases, measures taken to accept the risks of the agreement indicated the intentions of the parties within the text, signalling that they way in which parties modify their written contracts may be a strong indication of their intentions.
Anna Wong points out that identifying the intentions of the parties supports commercial certainty because this exercise strives to reach the most accurate interpretation of the text as evidence of mutual intention.29 Justice Martin in Earthco affirms that commercial certainty is upheld where the law gives effect to “what was actually agreed to by the parties,”30 and inversely, Wong writes that parties will have greater clarity when they know that the court’s determination is based on as accurate a picture of the parties’ intents as they can attain.31
It is worth noting that this avenue of interpretation is also possible due to the relative equivalence of the parties. As pointed out in Douez v Facebook, Inc.32, where both parties to a contract are sophisticated, commercial certainty may be a stronger priority because the question of unconscionability is not at play.33 This emphasizes the locus between freedom of contract and commercial certainty, where the internal consistency of the clauses furthers a presumption that a meeting of the minds was achieved. In Earthco, evidence of the mutual sophistication of the parties, and their contemplation of the risks of contracting outside of the SGA, reflected in the way in which the contract was written, provided a baseline for the court to consider public policy interests.
Part 2: The Will Around the Text
A. Using the factual matrix to uphold the independence of the parties
Reflecting on the limits of the strict enforcement of the contract, Waddams writes, “But if fairness is the underlying reason for the court’s conclusion, interpretation cannot, in the long run, be a satisfactory basis for it.”34 While an examination of the text of the contract in Earthco, as above, points to some support for a fair outcome, the decision, of course, did not arrive at the Supreme Court for it to only receive a strict textual analysis. Sattva, its predecessor, was very clear that the factual matrix of a contract is a key component of how it ought to be interpreted. The question therefore concerns the scope of the materials used to support a fair outcome beyond what is available in the text of the contract.
Sattva draws upon the historical significance of reliance35 to expand the role of precontractual behaviour in modern interpretation, reasoning that the purpose and nature of the contractual relationship leading up to the formation of the contract may interpret its key terms or clauses.36 While Anat Rosenberg posits that a consideration of the social context of a contract may amount to a “relaxation of the absoluteness of contractual rights,”37 Sattva cautiously draws in the commercial context prior to the contract only to supplement the contract’s text. It is for this reason that Camden Hutchison emphasizes that precontractual evidence is “only relevant if the contractual text is unclear,”38 for it is the potential absence of fairness within the contract that demands more evidence than what the text can offer.
As a point of public policy, Sattva was not the first to consider the context of an agreement. Justice Rothstein cites Reardon Smith Line v Hansen-Tangen,39 where an early contextual approach distinguished essential terms from mere descriptions through the context of the agreement, offering flexibility in a contract that would have otherwise been unrealistic according to commercial standards. Growing from the precedent of Reardon 21 years later, Investors Compensation Scheme v West Bromwich Building Society40 frames a similar contextual analysis through the lens of the reasonable person participating in the meeting of the minds. This offered a clearer objective standard from which the court could evaluate the understanding of the parties. The emphasis on reasonableness would continue in UK decisions parallel to Sattva, particularly in Triple Point Technology, Inc. v PTT Public Company Ltd.,41 where the court clarifies its interpretation of the contract in light of the parties’ rights and obligations. In this way, the relational context of the agreement becomes central when interpreting the contract, as the parties’ right to freedom of contract,42 and some degree of a duty of care to the other party,43 will be implicit if the agreement is fair. Nonetheless, the court in Triple Point still yields any contextual factors to a reasonable interpretation of the text, where any decision in the interest of fairness is limited by the presence or absence of “clear words” supporting an exclusion clause.44
In Sattva, the result is similar: contextual factors may inform, but cannot overwhelm the textual interpretation. However, Sattva’s approach to harnessing contextual factors paves the way for a more expansive approach to contextual interpretation. Justice Rothstein highlights that the circumstances surrounding the contract at the time of formation will “necessarily vary from case to case,”45 and inform the relationship between the parties, of which obligations are one element, and purpose is another.46 A purposive interpretation, subject to the limits of the text, allows for any objective evidence relevant to the execution of the contract to be considered,47 as opposed to only that which supplements a textual interpretation of a clause.48
The interpretive moves in Sattva therefore begin to align with Waddams’ desire for the courts to have their eyes opened to issues of fairness,49 where contracts are “not written in stone,” and “in the case of conflict between equity and law, equity shall prevail.”50 He writes that where the contract is not equitable, the court ought to muster tools to render the agreement fair, as the court of equity has historically done, relying on the nature of the transaction, the good faith of the parties, or other contextual factors.51
Earthco pursues these factors by harnessing them to identify the actual bargain arising from the meeting of the minds, and the behaviours supporting it. Significantly, the court in Earthco quietly drops the temporal qualifier52 on contextual evidence to offer more room for the court to consider the intentions of the parties. Justice Martin reasons that post-contractual evidence can be “used to assess what the parties objectively believed their agreement was at the time it was made,”53 indicating that post-contractual evidence may be just as useful as pre-contractual evidence, and contextual or commercial factors, in supporting an interpretation of the text.
These elements taken together enrich the court’s understanding of the nature of the transaction in its commercial context, where Pine Valley’s refusal to perform soil tests54 because they were in “a tremendous rush,” due to external pressures,55 is contrary to the usual course of a contractor’s work. Earthco anticipated that Pine Valley would rush the transaction by implementing the exclusion clause, which proved to be true when Pine Valley subsequently waived the right to test the soil. These facts reinforce an interpretation of the contract that recognizes the exclusion clause as an intentional acceptance of risk: the clause would only inform the transaction if Pine Valley subsequently chose to waive the soil tests, which was not common practice, and did not have to occur, even after the contract’s formation: it was merely an option available to Pine Valley. Reading the exclusion clause without turning an eye to how the transaction occurred would offer an incomplete picture of the parties’ expectations. It would be natural for the parties to operate in accordance with the agreement they believed they entered into, and the choices they believed were available to them in light of the contract.
Additionally, investigating the good faith of the parties in a commercial contract, where the duty is generally low,56 leads the court to ask if the parties reached an accurate, mutual understanding of the clause in question based on their behaviour before, after, and at the time of contract formation. According to Bhasin v Hrynew, good faith is measured by whether the parties acted “honestly and reasonably,”57 and whether they had “appropriate regard to the legitimate contractual interests of the contracting partner,” which points to the question of whether they achieved a thoughtful meeting of the minds.58 Earthco’s transparency during the negotiation process indicated their awareness and consideration of Pine Valley’s interests; particularly, Pine Valley’s freedom to test the soil or waive testing, and their interest in expedience. The fact that the clauses sought to avoid “the exact situation”59 of the parties after the transaction indicates the reasonableness of the anticipatory clause. The mutual sophistication of the parties exhibited during negotiations similarly indicates that the clauses were not implemented without significant forethought. These factors taken together support a finding that the parties were honest and transparent, facilitating a meeting of the minds that culminated in the inclusion of clauses informing Pine Valley’s waiver of their right to test the soil.
Furthermore, the holistic context of the agreement indicated that “magic words”60 were not needed for an exclusion clause to be valid. Justice Martin affirms that the clause must be read in light of who drafted it, being “two parties who had discussed both the changing nature of the soil’s composition as well as its testing and delivery.”61 When the parties transparently consider how they will form an agreement and operate subsequent to it, their conduct aligns with the written agreement to deepen its meaning. Clause 7, as the contract’s key example, only applies “[i]f Furfair waives its right to test,”62 requiring a specific set of decisions to be made after the contract was formed in order to apply. To read the contract holistically, “quality” of the soil must therefore be read in the context of Pine Valley’s decision not to test. This is because the “range of circumstances”63 that the Court must consider in its interpretation must encompass what the parties anticipated, and how this affected their decisions when carrying out the transaction. The quality of the soil, in the context of Clause 7, must refer to something that Pine Valley can verify if they wanted to protect their interests to the fullest extent, or something they can ignore in order to prioritize other interests, which they were free to do.
In this way, material evidence is gathered from around the contract and applied in order to approximate what the parties contemplated as accurately as possible, so that a clause does not fall flat on its textual meaning alone. In this case, an interpretation lacking the requisite context would have led to a legal interpretation outside the scope of the parties’ reasonable understanding.64 The Court demonstrates that an analysis of the context surrounding the contract, including any anticipated cause-and-effect scenarios, may be the best way to identify the parties’ “actual bargain”.65 As Anna Wong argues, this means that “[w]here the parties had the same meaning in mind, that meaning should be honoured and enforced”,66 as a point of fairness and freedom of contract. This leaves only the question of how wide the doors of contractual interpretation should be opened in pursuit of the intentions of the parties.
B. The absence of temporal limits is balanced by qualitative limits
One criticism of the Earthco decision could be that expanding the scope of contextual evidence considered may invite irrelevant or remote evidence into the analysis where it does not belong. While this may be possible, there are two key mechanisms in Earthco that continue to hold the line: first, that all contextual evidence “must never be allowed to overwhelm the words of [the] agreement,”67 and second, that the parties must be reasonably aware of the evidence,68 to the degree that the evidence supports an objective finding of the parties’ intentions.
i. Contextual evidence cannot overwhelm the text
A text-first approach to contractual interpretation is subtly maintained in Earthco by the Supreme Court’s emphasis on purposive interpretation, where the search for meaning must be consistent with the text, to fulfill the overall purpose of the contract, using contextual evidence to explain any ambiguities.69 Justice Martin foregrounds this hierarchy in his discussion of the different meanings words can take on, where a legal meaning may not be the most accurate reading, depending on a “consideration of the surrounding circumstances,”70 and similarly, in Corner Brook v Bailey, interpreting the changes from Sattva, “[t]he facts surrounding the formation of a contract are relevant to its interpretation.”71 This is not merely a recommendation, but a necessity, ameliorating the Court’s controversial exception to contextual interpretation in Ledcor Construction Ltd. v Northbridge Indemnity Insurance Co.72
Anna Wong, writing in 2016 after the Ledcor decision, writes, “If we accept that the interpretative process is the same for standard form contracts and bespoke contracts, then there is no reason to treat the interpretation of the former as a question of law and the latter as a question of mixed fact and law.”73 Which is to say that where a decision lacks a consideration of the surrounding context of the agreement on the basis that the contract is uniform goes against the court’s duty to reasonably review and interpret contracts. For, as Justice Wagner himself states, “there is no bright-line distinction [in contractual interpretation] between questions of law and those of mixed fact and law.”74 Instead, the “degree of generality”75 informs the level of specificity required, where the question arising from Ledcor is whether the baseline should be no contextual analysis, or merely a low level. Ledcor established that standard form contracts invite no consideration of contextual factors, due to the precedential value of this type of contract. However, O’Brien and Hancock observe that “the importance of precedential value [which differentiates questions of law] is unrelated to the question of whether the factual matrix plays an important role in the interpretive process.”76
In Sattva, the Court contemplated the possibility of future decisions like Ledcor, identifying that while contractual interpretation must seek to “ascertain the objective intent of the parties – a fact-specific goal,”77 some courts may “suggest that contractual interpretation is primarily a legal affair.”78 And yet, Justice Rothstein advises that this should be a rare occasion, in part because contextual evidence should be “consistent with the objectives of finality and certainty because it is used as an interpretive aid,”79 with the potential to only add or clarify the contract, because it cannot overwhelm the text, and therefore cannot detract from the text’s meaning.
For this reason, in Earthco, the Court reviews Ledcor to incrementally broaden its ruling on contextual evidence. Justice Martin acknowledges standard form contracts as an exception to Sattva, but emphasizes that Ledcor still permits a consideration of the reasonable expectations of the parties,80 which necessarily requires a consideration of the surrounding circumstances of the parties. He therefore argues that where evidence from the factual matrix that is “meaningful,” or pertinent to the interpretation of the written agreement, “the modern contractual interpretation approach from Sattva continues to apply.”81
This does not oust the general ruling from Ledcor but clarifies that where a party can argue the relevance of contextual evidence, the court may have a duty to review it, even in cases involving a standard form contract. The emphasis of the Court on the meaningfulness of this evidence creates the key distinction: if contextual evidence offers no interpretative value to the written contract, then considering it would not be in the best interests of the court. As such, Earthco’s reconciliation of Ledcor and Sattva creates an onus on the parties, in instances where a contract may be less ‘particular,’ to prove that contextual evidence is relevant in order to have it recognized. Nonetheless, reopening the door in all cases of contractual interpretation to consider contextual evidence is a procedural move made by in Earthco in that prioritizes the intentions of the parties, and a fair consideration of them.
ii. Evidence must be reasonably known to the parties
Similarly, the requirement that evidence must be reasonably known to the parties to be introduced is carried over from Sattva, which ensures that all contextual evidence provided to supplement the contract is brought with clean hands. Corner Brook v Bailey illustrates the importance of this limitation prior to Earthco, where the parties’ mutual objective awareness of the circumstances surrounding the breach supported the Court’s interpretation of the release.82 Justice Rowe, citing Bank of Credit and Commerce International SA v Ali, affirmed that the recognition of circumstances surrounding the contract must be limited to facts “reasonably available” to both parties, in accordance with the basic principles of construction, including an element of fairness.83 In this case, contextual evidence was limited to the event of the car crash, where both parties were present, and it could be proven that both parties had an objective knowledge of the facts supporting the third party claim.84 Their mutual awareness of the factual matrix, and its relevance to the interpretive issue at hand85 proved the importance of considering the context; they demonstrated how the parties intentions aligned with the subsequent events.
Furthermore, the Supreme Court in Corner Brook emphasized that contextual evidence must be grounded in objective facts, which is why the parties’ mutual awareness in this circumstance became so central. The release in question was grounded in the possibility of a particular kind of event, and therefore any evidence that could be grounded in the event contemplated by the parties was proven to be relevant due to its alignment with the written contract.86
Nonetheless, the Court did not go so far as to consider the negotiations leading up to the formation of the contract, which may have also informed the creation of the release, due to uncertainty about the line between the context surrounding contract formation and negotiations in isolation. This distinction illustrates how the Court in Corner Brook was beginning to apply Sattva’s emphasis on a holistic interpretation of the contract involving contextual evidence, but took an incremental approach, maintaining a temporal boundary as close to the issues relevant to the release as possible. Earthco takes this further, expanding the contextual scope to circumstances before and after the formation of the contract, but maintains a degree of caution drawing from Corner Brook by limiting contextual evidence to only that which the parties reasonably and objectively knew.87
In Earthco, the knowledge of the parties becomes a point of focus when examining their negotiations. While Corner Brook distinguishes between precontractual behaviour and negotiations, deeming the parties’ negotiations to be not sufficiently “determinative in interpreting the contract one way or another,”88 in Earthco, the parties’ negotiations were a key element illustrating the parties’ intentions and contemplation of risk.89 The Court used direct quotes from correspondence between the parties during negotiation to depict the parties’ mutual awareness of the risks of not testing the soil, and paired this information with post-contractual behaviour to support their recognition of the exclusion clause.90 In this manner, the negotiations of the parties were just as informative and necessary for consideration as post-contractual evidence, working together to complete the puzzle of the parties’ intentions. In the same way that the Court considers the outcome of Pine Valley’s waiver to interpret the scope of the exclusion clauses, the meaning of the words within the clauses were “the product of their individual conversations and negotiations.”91 Earthco demonstrates that when the court has the freedom to look in and around the contract to any evidence that would inform its meaning and formation, that evidence will create a clearer picture of how the parties used their freedom to create an agreement in their own interests.
The Supreme Court’s expansion of the scope of contextual evidence avoids the risk of implying terms outside the parties’ intentions or interpreting clauses in a way that would be outside of the parties’ scope of understanding. Relying on the negotiations of the parties, where they can be proven, maintains the rule from Sattva that evidence used to support the written contract must be objectively known to both of the parties, while affording them the opportunity to retrace the steps of how the contract was drafted. Keeping the intentions of the parties at the core of this investigation ensures that any contextual evidence will not overwhelm or contradict the written agreement, as it is still the case that where the written agreement clearly demonstrates the will of the parties, it will be considered first and foremost.
Conclusion
“Proof of the parties’ intentions,” writes Neil Duxbury, “not assertions that those intentions corresponded, is far more important to the courts.”92 In commercial agreements, this rings as true as it did in the nineteenth century. The scope of this proof has dramatically changed in Canada in the last twelve years, where Earthco signals the latest push towards public policy interests through the expanding role of contextual evidence. Using contextual evidence to focus on the purpose of the agreement and what the parties contemplated steers the court away from a normative approximation of what the parties ought to have intended, and towards their true intentions.
Using this incremental framework further encourages courts to rule in the interest of public policy, where judges are not limited by the temporality of the evidence, but can instead prioritize the material value of the evidence available to support the text of the agreement. This continues to be a measured approach, as it maintains that where extensive context is not necessary to arrive at a clear interpretation of the contract, it is not mandatory; courts may focus their limited resources on other elements of the case. Nonetheless, where a party believes that contextual evidence will support how their intentions are expressed within the text, there is a duty for the court to respond and give consideration at some level to this evidence.
Allowing the principles of modern contextual interpretation to ebb and flow in this manner aligns with the character of public policy itself; like water, to flow freely, filling gaps where they are present, and moving on where they are not. While there may always be the potential for public policy interventions to be applied beyond their reasonable scope, this purpose-driven approach offers a system of guardrails to affirm the roles of the court: to meaningfully balance the interests of the parties and the public in the pursuit of fairness.
Bibliography
Legislation
Sale of Goods Act, RSO 1990, c S.1.
Jurisprudence
Bank of Credit and Commerce International SA v Ali, [2001] UKHL 8.
Bhasin v Hrynew, 2014 SCC 71.
CM Callow Inc v Zollinger, 2020 SCC 45.
Corner Brook v Bailey, 2021 SCC 29.
Douez v Facebook, Inc., 2017 SCC 33.
Earthco Soil Mixtures Inc. v Pine Valley Enterprises Inc., 2024 SCC 20.
Hayes Forest Services Ltd. v Weyerhaeuser Co., 2008 BCCA 31.
Hunter Engineering Co. v Syncrude Canada Ltd., 1989 CanLII 129 (SCC).
IFP Technologies (Canada) Inc v EnCana Midstream and Marketing, 2017 ABCA 157.
Investors Compensation Scheme v West Bromwich Building Society, [1997] UKHL 28.
Ledcor Construction Ltd. v Northbridge Indemnity Insurance Co., 2016 SCC 37.
Levison v Patent Steam Carpet Cleaning Co. Ltd., [1978] QB 69.
Persimmon Homes Ltd. v Ove Arup & Partners Ltd. & Anor, [2017] EWCA Civ 373.
Pine Valley v Earthco, 2020 ONSC 601.
Reardon Smith Line Ltd. v. Hansen Tangen, [1976] 3 All ER 570.
Sattva Capital Corp. v Creston Moly Corp., 2014 SCC 53
Shewchuk v Blackmont Capital Inc., 2016 ONCA 912.
Tercon Contractors Ltd. v British Columbia (Transportation and Highways), 2010 SCC 4.
Triple Point Technology, Inc. v PTT Public Company Ltd., [2021] UKSC 29.
Secondary Sources
Cotton-O’Brien, Peter Roy & Calvin Hancock, “The Limits of Ledcor: Persisting Problems with the Interpretation of Standard Form Contracts” (2019) 62:1 Can Bus LJ 35.
Duxbury, Neil, “Jurists’ Law” in “Frederick Pollock and the English Juristic Tradition” (Oxford: Oxford University Press, 2004) 184 at 194.
Hall, Geoff R, “Canadian Contractual Interpretation”, 2nd ed (Markham: LexisNexis, 2012).
Hunt, Chris DL & Milad Javdan, “Apparitions of Doctrines Past: Fundamental Breach and Exculpatory Clauses in the Post-Tercon Jurisprudence” (2018) 60:3 Can Bus LJ 309.
Hutchison, Camden, “Principles of Interpretation as Applied to Corporate Articles: A Comment on Rogers v Rogers Communications Inc.” (2022) 45 Man LJ 153.
Rosenberg, Anat, “Contract’s Meaning and the Histories of Classical Contract Law,” (2013) 59:1 McGill LJ 165.
Waddams, Stephen, “Interpretation and Implied Terms” in “Sanctity of Contracts in a Secular Age: Equity, Fairness, and Enrichment” (Cambridge: Cambridge University Press, 2019) 53.
Waddams, Stephen, “Public Policy” in “Sanctity of Contracts in a Secular Age: Equity, Fairness, and Enrichment” (Cambridge: Cambridge University Press, 2019) 201.
Wong, Anna SP, “Contract’s Latest Interpretive Turn: Role of Prior Negotiations and Subsequent Conduct in Interpretation,” (2025) 70 CBLJ 173.
Wong, Anna, “Ledcor is unlikely to settle the dust” (14 November 2016) Can LT 7.
Endnotes
1 Earthco Soil Mixtures Inc. v Pine Valley Enterprises Inc., 2024 SCC 20 at para 109 [Earthco].
2 Sattva Capital Corp. v Creston Moly Corp., 2014 SCC 53 [Sattva].
3 Tercon Contractors Ltd. v British Columbia (Transportation and Highways), 2010 SCC 4 [Tercon].
4 Levison v Patent Steam Carpet Cleaning Co. Ltd., [1978] QB 69 (CA).
5 Ibid at 81.
6 Tercon, supra note 3 at paras 66-79; Stephen Waddams, “Interpretation and Implied Terms” in Sanctity of Contracts in a Secular Age: Equity, Fairness, and Enrichment (Cambridge: Cambridge University Press, 2019) 53 at 65. See also, Chris DL Hunt & Milad Javdan, “Apparitions of Doctrines Past: Fundamental Breach and Exculpatory Clauses in the Post-Tercon Jurisprudence” (2018) 60:3 Can Bus LJ 309.
7 Tercon, Ibid at para 66.
8 Ibid at para 78.
9 Waddams, supra note 6.
10 Waddams, supra note 6 at 67.
11 Ibid at para 47.
12 Ibid at para 104.
13 Earthco, supra note 1 at para 84.
14 Tercon, supra note 3 at para 68.
15 Ibid at para 72.
16 Ibid at para 117.
17 Ibid at para 76.
18 Hunter Engineering Co. v Syncrude Canada Ltd., 1989 CanLII 129 (SCC); [1989 1 SCR 426 at 450.
19 Sale of Goods Act, RSO 1990, c S.1 [SGA].
20 Earthco, supra note 1 at para 87.
21 Ibid at para 91.
22 Earthco, supra note 1 at para 93.
23 Stephen Waddams, “Public Policy in Sanctity of Contracts in a Secular Age: Equity, Fairness, and Enrichment” (Cambridge: Cambridge University Press, 2019) 201 at 202.
24 Earthco, Ibid at para 41.
25 Ibid at para 84.
26 Persimmon Homes Ltd. v Ove Arup & Partners Ltd., [2017] EWCA Civ 373 [Persimmon].
27 Ibid at para 58.
28 Ibid at para 57.
29 Anna SP Wong, “Contract’s Latest Interpretive Turn: Role of Prior Negotiations and Subsequent Conduct in Interpretation,” (2025) 70 CBLJ 173 at 18.
30 Earthco, supra note 1 at para 92.
31 Wong, supra note 29 at 18.
32 Douez v Facebook, Inc., 2017 SCC 33.
33 Ibid at para 31.
34 Waddams, supra note 6 at 69.
35 Anat Rosenberg, “Contract’s Meaning and the Histories of Classical Contract Law”, (2013) 59:1 McGill LJ 165 at 190.
36 Sattva, supra note 2 at para 48.
37 Rosenberg, supra note 35 at 190.
38 Camden Hutchison, “Principles of Interpretation as Applied to Corporate Articles: A Comment on Rogers v Rogers Communications Inc”. (2022) 45 Man LJ 153 at 160.
39 Reardon Smith Line Ltd. v. Hansen‑Tangen, [1976] 3 All ER 570 [Reardon], cited in Sattva, supra note 2 at para 47.
40 Investors Compensation Scheme v West Bromwich Building Society, [1997] UKHL 28 at 115.
41 Triple Point Technology, Inc. v PTT Public Company Ltd., [2021] UKSC 29 [Triple Point].
42 Ibid at para 108.
43 Ibid at paras 112-113.
44 Ibid at 120-121.
45 Sattva, supra note 2 at para 58.
46 Ibid at para 55.
47 Ibid at para 58.
48 Triple Point, supra note 41 at para 134.
49 Waddams, supra note 6 at 58.
50 Ibid at 56.
51 Ibid at 56-57.
52 Paraphrasing Wong, supra note 29 at 11.
53 Earthco, supra note 1 at para 107.
54 Ibid at para 110.
55 Ibid at para 108.
56 CM Callow Inc v Zollinger, 2020 SCC 45at para 83.
57 Bhasin v Hrynew, 2014 SCC 71 at para 63.
58 Ibid at para 65.
59 Earthco, supra note 1 at para 109.
60 Ibid at para 98.
61 Ibid at para 89.
62 Pine Valley v Earthco, 2020 ONSC 601 at para 26.
63 Earthco, supra note 1at para 91.
64 Ibid at para 104.
65 Ibid at para 97.
66 Wong, supra note 29 at 19.
67 Sattva, supra note 2 at para 57, citing Hayes Forest Services Ltd. v Weyerhaeuser Co., 2008 BCCA 31 at para. 14; and Geoff R. Hall, “Canadian Contractual Interpretation”, 2nd ed (Markham: LexisNexis, 2012) at 30.
68 Earthco, supra note 1 at paras 16, 20, 105.
69 See also Shewchuk v Blackmont Capital Inc., 2016 ONCA 912 at para 56.
70 Ibid at para 98.
71 Corner Brook (City) v Bailey, 2021 SCC 29 at para 19 [Corner Brook].
72 Ledcor Construction Ltd. v Northbridge Indemnity Insurance Co., 2016 SCC 37 [Ledcor].
73 Anna Wong, “Ledcor is unlikely to settle the dust” (14 November 2016) Can LT 7.
74 Ledcor, supra note 70 at para 41.
75 Ibid.
76 Peter Roy Cotton-O’Brien & Calvin Hancock, “The Limits of Ledcor: Persisting Problems with the Interpretation of Standard Form Contracts” (2019) 62:1 Can Bus LJ 35 at 44.
77 Sattva, supra note 2 at para 49.
78 Ibid.
79 Ibid at para 60.
80 Earthco, supra note 1 at para 29, citing Ledcor, supra note 70 at para 95.
81 Earthco, Ibid at para 29.
82 Corner Brook, supra note 69 at para 53.
83 Bank of Credit and Commerce International SA v Ali [2001] UKHL 8 at para 49, cited in Corner Brook, Ibid at para 49.
84 Ibid at para 58.
85 Ibid at para 43.
86 Ibid at paras 41, 48.
87 Corner Brook, supra note 69 at para 20. See also, IFP Technologies (Canada) Inc v EnCana Midstream and Marketing, 2017 ABCA 157 at para 85.
88 Corner Brook, supra note 69 at para 57.
89 Earthco, supra note 1 at para 102.
90 Ibid at para 107.
91 Ibid at para 102.
92 Neil Duxbury, “Jurists’ Law” in “Frederick Pollock and the English Juristic Tradition” (Oxford: Oxford University Press, 2004) 184 at 194.